When I assign a resource to overhead. I do not get an option to put a percentage allocation. It applies the full man days?
Hi There, you can set a percentage based allocation by setting a partial resource. For example, in the attached screenshot, the overhead is set to 0.25 roles, which results in 30 total days (25% allocation for the 120 day duration).